MAT Road Project No. 4 Service Route 97

Service Route 97 (Carrizo Trail), 0.78 Miles, The scope of the project includes roadway improvements (full depth reclamation, full reconstruction, concrete paving), driveway reconstruction, ADA ramps improvements, permanent signing and striping, and drainage improvements.
Contract Docs & Specs (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Contract Document PN 4 - Route 97 17.9 MB
Geotech Report Mescalero Project 4 Service Routes 4 8 97 377 _4224012 7.8 MB