MAT Road Project No. 4 Service Route 97
Service Route 97 (Carrizo Trail), 0.78 Miles, The scope of the project includes roadway improvements (full depth reclamation, full reconstruction, concrete paving), driveway reconstruction, ADA ramps improvements, permanent signing and striping, and drainage improvements.
Contract Docs & Specs
(click to expand/collapse)
Name | Size | ||
Contract Document PN 4 - Route 97 | 17.9 MB | ||
Geotech Report Mescalero Project 4 Service Routes 4 8 97 377 _4224012 | 7.8 MB |