MAT Road Project No. 4 Service Route 97
Service Route 97 (Carrizo Trail), 0.78 Miles, The scope of the project includes roadway improvements (full depth reclamation, full reconstruction, concrete paving), driveway reconstruction, ADA ramps improvements, permanent signing and striping, and drainage improvements.
Plan Set
(click to expand/collapse)
Name | Size | ||
NM-8771-23_CarrizoTrail Final Plans Stamped | 47.0 MB | ||
NM-8771-23_CarrizoTrial X-Sections | 8.0 MB |