21000 West Water Line Replacement Project

The Work consists of construction of the 21000 West Water Line Replacement Project. This project includes replacement of an 8 inch culinary water. The work generally consists of the installation of 2,700 Feet of 8 inch PVC C900 culinary water line, along with associated fittings, valves and service reconnections.
Addendum ! (click to expand/collapse)
Updated bid schedule, measurement and payment, plan sheets with updated utilities and clarifying notes.
Name Size
_ADDEND_1 7.8 MB